Engineering suite

Wastewater process design assistant

Adjust the sliders to size a first-pass biological treatment train. Climate-compensated for typical Saudi temperatures — the technology recommendation, oxygen demand and tank volume update live.

Influent characteristics

1,000 m³/day
50 m³10,000 m³20,000 m³
250 mg/L
30 mg/L (light)300 (sanitary)1,000 (industrial)
500 mg/L
60 mg/L600 (medium)2,000 (heavy)
35 °C
15 °C (winter)35 °C (KSA avg.)45 °C (peak)
COD ÷ BOD biodegradability ratio: 2.00

Excellent biochemical ratio (< 3) — standard biological MBR or MBBR will work efficiently on this raw liquid.

Process recommendation

Theoretical estimate
Proposed engineering setup
Integrated Membrane Bioreactor (MBR) system

Gold standard for sanitary camp recycling. Produces pathogen-free, highly clarified water ready for zero-restriction irrigation.

Average hourly flow
42 m³/hr

Daily flow ÷ 24. Real diurnal peaks typically run 2–3× this average.

BOD mass load
250.0 kg BOD/day

Biological load that must be digested by the reactor.

COD mass load
500.0 kg COD/day

Total chemical oxygen demand entering the plant daily.

Hydraulic retention (HRT)
6 hours

Time wastewater must stay in the biological reactor.

Aeration basin volume (theoretical)
250
Suggested SKU
WT-1200

Concrete aeration basin sized to sustain healthy MLSS bacteria. SKU is the nearest off-the-shelf containerised match.

Oxygen demand & blower sizing

Oxygen demand
312.5 kg O₂/day

1.25 kg O₂ per kg BOD removed (Metcalf & Eddy, BOD-only basis — add 4.57 × NH₄‐N if nitrifying).

Required airflow
8,094 Nm³/hr

Assumes ~22% SOTE fine-bubble diffusers at 5 m depth.

Climate correction: design temperature set at 35 °C. Blower capacity scaled by Arrhenius factor θ(T−20) with θ = 1.024 ⇒ ×1.43 (+43%) vs. the 20 °C reference, matching the standard activated‐sludge temperature correction.

These estimates are for first-pass conceptual screening only. Real engineering projects require lab characterisation, piloting and site verification. Contact Water Tech. for stamped calculations and a guaranteed performance proposal.

Send these specs to our team Get a formal proposal